Tuesday, November 18, early evening.
Our client LBX, specializing in the machining of wheels, axles and complete assembled axles for the railway sector, is facing a critical situation.
A shortage of Shell GADUSRAIL S3 EUFR grease, essential to its operations, risks compromising the continuity of its production, organized in 2 shifts and mobilizing 4 operators.
Antoine Léonard, maintenance manager at LBX, then contacted our sales engineer Axel Piccinin, who specializes in the industrial sector and particularly in metalworking.
The challenge: deliver a 180kg drum before 8am the next morning!
Aware of the urgency and the potential consequences of a production stoppage, Axel immediately mobilized our teams.
Our operations manager and warehouse staff decided to move their shifts forward to allow order preparation from the early hours of the morning.
Thanks to our own delivery vehicle, the drum of grease is delivered to LBX as early as 8 a.m.!
- A stock shortage has been resolved.
- Supply restored.
- A production that can continue without interruption.
A huge congratulations to Axel Piccinin and our entire operational and logistics team for this collective effort!
This intervention perfectly illustrates one of BELUB's four fundamental values: COMMITMENT.
Because behind every delivery, there are women and men who understand the challenges faced by their clients, assess the consequences of a difficulty, and mobilize to provide a solution.
At BELUB, we don't just deliver lubricants. We help maintain equipment availability and production continuity for our customers.
Because commitment isn't proclaimed. It's demonstrated on the ground!